On Mon, 28 May 2007, Gordon Hughes wrote:
 All that is needed is an option in the probit model to generate the 
 Mills ratio as a post-estimation variable.  I haven't checked whether it 
 is there already but it could easily be added. 
The Mills ratios are the generalised residuals in the probit case; hence, 
you can access them as the probit residuals.
Riccardo (Jack) Lucchetti
Dipartimento di Economia
Università Politecnica delle Marche
r.lucchetti(a)univpm.it
http://www.econ.univpm.it/lucchetti